Supplied 80 per cent steel required for Sardar Sarovar Project: Steel Authority of India

SAIL supplied around 85,000 tonnes of steel for the entire Sardar Sarovar Narmada project which comprises all the canals throughout Gujarat which are connected to Narmada River and Dam.

Published: 17th September 2017 09:29 PM  |   Last Updated: 17th September 2017 09:29 PM   |  A+A-

An advertisement of Steel Authority of India Ltd. (SAIL) at a street in New Delhi. (File photo | Reuters)

By PTI

NEW DELHI: State-owned SAIL today said it has supplied 80 per cent steel required for the construction of Sardar Sarovar Project, inaugurated by Prime Minister Narendra Modi.

"Once again partnering in one of the most prestigious and important national projects, Steel Authority of India Ltd (SAIL) has supplied 80 per cent steel required for construction of the Sardar Sarovar Project inaugurated by Prime Minister Narendra Modi today," the public sector firm said in a statement.

SAIL supplied around 85,000 tonnes of steel (TMT) for the entire Sardar Sarovar Narmada Nigam Ltd (SSNNL) project which comprises all the canals throughout Gujarat which are connected to Narmada River and Dam, the statement said.

The Sardar Sarovar project is the second largest concrete gravity dam (by volume) and has the world's third largest spillway discharging capacity.

The Sardar Sarovar Dam is a gravity dam built on Narmada river near Navagam, Gujarat, which will benefit four states Gujarat, Madhya Pradesh, Maharashtra and Rajasthan, the company said.

A part of the Narmada Valley Project, it will help in irrigation and electrical power supply.

The company said it is a part of a large hydraulic engineering project, involving the construction of a series of large irrigation and hydroelectric multi-purpose dams on the Narmada river.

One of the 30 dams planned on river Narmada, Sardar Sarovar Dam (SSD) is the largest structure to be built.

"The project will irrigate more than 18,000 m2 (190,000 sq ft), most of it in drought prone areas of Kutch and Saurashtra. The total installed capacity of the power facilities is 1,450 MW," the steel major said.

 

Stay up to date on all the latest Business news with The New Indian Express App. Download now

Comments

Disclaimer : We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the newindianexpress.com editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.

The views expressed in comments published on newindianexpress.com are those of the comment writers alone. They do not represent the views or opinions of newindianexpress.com or its staff, nor do they represent the views or opinions of The New Indian Express Group, or any entity of, or affiliated with, The New Indian Express Group. newindianexpress.com reserves the right to take any or all comments down at any time.