Adani Power climbs after commissioning of power plant at Tiroda - The New Indian Express

Adani Power climbs after commissioning of power plant at Tiroda

Published: 04th April 2014 01:19 PM

Last Updated: 04th April 2014 01:19 PM

Adani Power, part of the Adani Group, a global integrated infrastructure player, climbed on Friday after the company commissioned its fourth unit of 660 megawatts (MW) at power plant at Tiroda in Maharashtra. Adani Power has added 2,640 MW in the last financial year, accounting for nearly 15% of the overall capacity addition of about 17,000 MW in the country.Shares of the company are trading at Rs 53.20, up Rs 1.55, or 3% at the Bombay Stock Exchange (BSE) on Friday at 11:51 a.m.The scrip has touched an intra-day high of Rs 53.55 and low of Rs 52.20. The total volume of shares traded at the BSE is 1,089,937.In the earlier session, the shares rose 2.99%, or Rs 1.5, at Rs 51.65. Currently, the stock is trading down 14.74% from its 52-week high of Rs 62.40 and above 80.65% over the 52-week low of Rs 29.45.

comments powered by Disqus

Disclaimer: We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the NIE editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.


follow us Mobile Site iPad News Hunt Android RSS Tumblr Linekin Pinterest Youtube Google Plus Twitter Facebook