MEIL’s rapid progress on Assam Renewal project - The New Indian Express

MEIL’s rapid progress on Assam Renewal project

Published: 28th August 2012 11:19 AM

Last Updated: 28th August 2012 11:19 AM

City-based Megha Engineering and Infrastructures Limited (MEIL) was awarded the Rs 2400 crore Assam Renewal Project (ARP). A.K.Hazarika, Director-Onshore, ONGC, visited the MEIL factory at Jeedimetla and flagged off critical equipment on Sunday.

This equipment will be used in the ARP project construction and in the next one month, over 100 equipments will be sent to the Assam Project. The equipment is fabricated by MEIL on time and in accordance with international quality standards.

MEIL is playing a lead role in building facilities in the oil and natural gas domain, and is developing robust competencies for the execution of national and international projects. MEIL’s capabilities in the field of Hydrocarbon engineering are vital because of its contribution to the National Product. Chairman P.P. Reddy, MEIL Managing Director P.V. Krishna Reddy, Chief-

OES Bakshi, ED-OES, B.K. Baruah, and Ananda Mohan, GM, participated in the programme.

comments powered by Disqus

Disclaimer: We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the NIE editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.


Read More


Astrology


follow us Mobile Site iPad News Hunt Android RSS Tumblr Linekin Pinterest Youtube Google Plus Twitter Facebook