Mullaperiyar dam survey cleared - The New Indian Express

Mullaperiyar dam survey cleared

Published: 17th September 2009 01:17 AM

Last Updated: 16th May 2012 12:23 AM

KOCHI: One more hurdle in the construction of a new dam at Mullaperiyar has been removed with the Union Forest and Environment Ministry giving the green signal for the survey of the new dam.Water Resources Minister N K Premanchandran told Express that the preliminary work had started and that the survey was expected to be completed in two months. The detailed project report will then be prepared. Premachandran thanked the Union Government for giving the clearance.

The survey has to be conducted in the thick forest of the Periyar Tiger Reserve, for which adequate security is needed.

Ten kilometres of the proposed area of the project is to be surveyed.

The survey of seven kilometres has been completed and that for the remaining three kilometres will be conducted through the forest.

The Minister said that the construction of a new dam had been a longstanding demand of Kerala as the existing dam is weak and poses a hazard to thousands of people in Central Kerala. The clearance from the Natural Wild- Life Board is a positive step.

He pointed out that the dispute between Kerala and Tamil Nadu over construction of the new dam will be over only after the Supreme Court gives a final verdict in this regard, which is expected by October 20.

comments powered by Disqus

Disclaimer: We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the NIE editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.


Read More



follow us Mobile Site iPad News Hunt Android RSS Tumblr Linekin Pinterest Youtube Google Plus Twitter Facebook