STOCK MARKET BSE NSE

Bidding for ORR

The Gachibowli to Shamshabad stretch (24.38 km) of the Outer Ring Road will soon be handed over to private agencies for operations and maintenance (O&M) for a period of three years.

Published: 05th February 2014 11:32 AM  |   Last Updated: 05th February 2014 11:32 AM   |  A+A-

ORR

The Gachibowli to Shamshabad stretch (24.38 km) of the Outer Ring Road will soon be handed over to private agencies for operations and maintenance (O&M) for a period of three years.

In this connection, the Hyderabad Growth Corridor Limited (HGCL) has invited bids from agencies and the last date is February 15. The contractor will be required to perform all routine road maintenance activities along the project roads, utilising mechanised equipment and methods to perform these obligations.

Routine road maintenance will include planned works and repairs of small defects like local potholes through crack sealing, asphalt treatment etc. It will also require unscheduled maintenance by irregular events such as accidents and natural calamities.

HGCL officials told Express that routine and adhoc road maintenance would include activities such as road sign maintenance, guard rail and supplementary road furniture repairs, maintenance of rigid pavements, repairs of accident damaged assets, maintenance of culverts, drains and channels, clearing of litter and debris, and so on.

Security guards and personnel will also have to deployed by the contractor to protect the road property as well as control all unauthorised access to the service roads and see that no damage occurs to the footpaths, kerbs, drains, fencing etc.

The contractor will have to maintain an Incident Management System (IMS) and supply regular incident statistics to HGCL. He will have to identify relevant agencies (rescue, fire, hazardous materials, traffic, police, ambulance, hospitals, alternative routes, clean-ups) and their representatives and liaise with these representatives on behalf of the employer.

The IM centre should work on a 24-hour basis and will have to maintain records of the details of all incidents (collision, hazardous material, breakdown, etc). After occurrence of any major incident, resulting in multiple loss of life, significant periods of road closure or major route rehabilitation work, an incident debriefing report shall be produced and forwarded to HGCL.

Contractor will be responsible for removal of all animals causalities like cows, buffalos, birds, dogs and cats from the carriageway and bury them at a suitable location within two hours of the incident.

Stay up to date on all the latest Hyderabad news with The New Indian Express App. Download now

Comments

Disclaimer : We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the newindianexpress.com editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.

The views expressed in comments published on newindianexpress.com are those of the comment writers alone. They do not represent the views or opinions of newindianexpress.com or its staff, nor do they represent the views or opinions of The New Indian Express Group, or any entity of, or affiliated with, The New Indian Express Group. newindianexpress.com reserves the right to take any or all comments down at any time.

flipboard facebook twitter whatsapp