Nation
Bengaluru’s new metro station on Whitefield corridor waterlogged after rains
Heavy rains led to massive waterlogging at Bengaluru’s Nallurhalli metro station just days after that stretch of the metro was inaugurated by PM Modi. The new metro line, which runs from Whitefield (Kadugodi) to Krishnarajapuram, was inaugurated by the PM on March 25. It was built at a cost of ₹ 4,249 crore. Visuals of the inundated Nallurhalli metro station were shared by several users on Twitter.