Uttar Pradesh's UPNDA annuls tender won by Adani Green Energy for solar projects

With this, AGEL's portfolio of renewable generation capacity stands at 3.50 GW with 1.96 GW operational projects and balance 1.54 GW in development stage, the filing said.
Adani Group chairman Gautam Adani. (File | AFP)
Adani Group chairman Gautam Adani. (File | AFP)

NEW DELHI: Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has annulled a tender bagged by Adani Green Energy for setting up 250 MW solar generation projects.

"Adani Green Energy Ltd (AGEL), through its wholly-owned subsidiary Mahoba Solar (UP) Pvt Ltd had won a tender for setting up 250 MWac solar generation projects floated by Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA). The said tender has been annulled by UPNEDA," the company said in a BSE filing.

With this, AGEL's portfolio of renewable generation capacity stands at 3.50 GW with 1.96 GW operational projects and balance 1.54 GW in development stage, the filing said.

Related Stories

No stories found.

X
The New Indian Express
www.newindianexpress.com