Hyderabad Metro Rail Limited
img

Lift facility at Secunderabad (East) Metro station inaugurated

It will also provide seamless connectivity to all passengers and is a boon to elderly people and differently abled persons.

published on : 11th November 2023
img

Hyderabad Metro Rail Limited begins drone survey for Old City Metro

Survey conducted for evolving appropriate engg. solutions to save sensitive structures

published on : 28th August 2023
img

HMRL set to start soil testing for Old City Metro project

The geotechnical investigation of the soil will cost an estimated Rs 25-Rs 26 lakh and is being seen as a concrete step toward implementing the Old City Metro project.

published on : 23rd August 2023
img

Elevated Metro rail to be cost effective: HMRL MD

The expansion plans aim to develop and decongest Hyderabad to accommodate a projected population increase of one crore in and around ORR limits.

published on : 2nd August 2023
img

HMRL begins preparatory work for Old City metro

Learning lessons from the Phase 1 project in the rest of the city, road will be widened at the station locations to 120 feet.

published on : 17th July 2023
Isreal Conflict