After India's proposal, Nepal starts discussion on Kathmandu-Raxaul Railway

Nepal and India had agreed to expedite the construction of the railway project connecting Kathmandu to Raxaul at the Nepal-India border.

Published: 06th October 2020 01:23 PM  |   Last Updated: 06th October 2020 01:23 PM   |  A+A-

India-Nepal ties

Flags of Nepal (Left) and India (File photos | PTI)

By ANI

KATHMANDU: Nepal government has started a discussion with various stakeholders on the proposal sent by India to conduct the Detailed Project Report (DPR) of the proposed Kathmandu-Raxaul Railway.

Sources at the Ministry of Foreign Affairs (MoFA) have confirmed that the proposal to conduct the DPR amid pandemic been forwarded to various consolatory mechanisms and stakeholders.

"It has been forwarded to Ministry of Health, COVID-19 Crisis Management Centre for further discussions seeking their suggestions to conduct the study amid the pandemic," one of the high officials at MoFA said.

The Indian government last month had sent the proposal to Nepal seeking permission to conduct a detailed study of Kathmandu-Raxaul Railway link. Konkan Railway Corporation has been proposed to conduct the DPR of the project.

Nepal and India had agreed to expedite the construction of the railway project connecting Kathmandu to Raxaul at the Nepal-India border.

The agreement was formalised after Prime Minister KP Sharma Oli and Indian Prime Minister Narendra Modi witnessed the signing of a Memorandum of Understanding to this effect on the sideline of the 4th Summit of Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation (BIMSTEC) held in Kathmandu on August 30-31, 2018.

The length of the Kathmandu-Raxaul electric railway will be 219 km with a double track and 135.87 km with a single track, according to the preliminary report. The report shows that 892 hectares of land including 13 stations and 39 tunnels will be required for the railway construction.

The Indian government in its budget for 2020-21 has allocated necessary funds for the construction of the project. The electric railway link is estimated to cost around Rs 300 billion. It will run from the site of the proposed second international airport in Nijgadh after passing through Jipur of Bara district.



Comments

Disclaimer : We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the newindianexpress.com editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.

The views expressed in comments published on newindianexpress.com are those of the comment writers alone. They do not represent the views or opinions of newindianexpress.com or its staff, nor do they represent the views or opinions of The New Indian Express Group, or any entity of, or affiliated with, The New Indian Express Group. newindianexpress.com reserves the right to take any or all comments down at any time.

flipboard facebook twitter whatsapp