MEMU train

MEMU train to Bengaluru suffers engine failure

Train no. 06256, which departed from Mysuru at 6.10 am, was supposed to reach KSR Bengaluru at 9.15 am after crossing Kengeri around 8.15 am.

published on : 31st May 2022

Five months post-electrification, three MEMU train pairs to run on Bengaluru-Tumakuru route

MEMUs will have washrooms and a quicker commute between the destinations as compared to regular trains.

published on : 5th April 2022

Bhubaneswar-Nayagarh MEMU train gets better interiors

The train’s coaches have been manufactured with stainless steel and it has an aerodynamically shaped stainless steel front end nose for reduced air resistance thereby saving energy. 

published on : 16th December 2021