Image for representational purpose only. ( File/ EPS) 
Bengaluru

Bengaluru: Doubling of railway line commissioned

Now, doubling is ready between Tumukuru and Hubbali but not between Bengaluru and Tumukuru.

From our online archive

BENGALURU: With the symbolic running of two trains on two railway tracks, 18-km of doubling line between Tumukuru and Gubbi, which falls under the Bangalore Railway Division, was commissioned on Wednesday.

This will pave way for faster running of trains between Bengaluru and Hubballi when the entire stretch is doubled. According to Chief Administrative Officer, Constructions, K C Swami, “This is the second part of the 96-km doubling project between Tumukuru and Arasikere. The first doubling stretch of 36km was commissioned between Arasikere and Karadi on November 29, 2018. We expect the entire doubling on the line to be ready within two years,” he said.

Asked if it will have any immediate impact, Swami said, “Though one stretch is doubled, line blocks will be effected along other portions to complete the project. The real impact on trains can be seen only when an entire line gets ready.”

Now, doubling is ready between Tumukuru and Hubbali but not between Bengaluru and Tumukuru.

Govt ready for 'comprehensive discussion' on paper leak issue, says JP Nadda

INDIA bloc slams Congress over Rahul Gandhi's PM residence protest without prior consultation

Why has 'Satluj' become an issue?

DU faces backlash over appeal for calm amid NEET-UG protests; teachers, student groups hit out

Sharad Pawar meets PM Modi as talk of NCP (SP)-NDA rapprochement grows

SCROLL FOR NEXT