Construction debris dumped into the Kosasthalaiyar river obstructing the flow of water | Express 
Chennai

TANGEDCO ordered to remove all debris from Kosasthalaiyar river

The Madras High Court has directed the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) to remove even the last bit of debris dumped on the Kosasthalaiyar river.

Express News Service

CHENNAI:  The Madras High Court has directed the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) to remove even the last bit of debris dumped on the Kosasthalaiyar river. Taking a grim view of TANGEDCO’s submission that 80 per cent of the debris had been removed, the first bench of Chief Justice Sanjib Banerjee and Justice PD Audikesavalu asked the chairperson of the power entity to look into the matter.

“The chairperson or the principal executive officer of TANGEDCO will look into the matter and ensure that the last bit of foreign material put in the waterbody in course of construction has been removed,” the bench said. It ordered that a report in this regard should be filed when the matter comes up for hearing a week after Deepavali break.

“TANGEDCO will submit a status report indicating that 80 per cent of the offending material has already been removed. It will not do for TANGEDCO to remove part of the material and leave the remainder in the waterbody that would choke the same or impede flow of water,” the judges said. “The entirety of the rubbish, concrete and construction material has to be removed and no trace of it left behind in the waterbody,” they affirmed.

India to get 114 Rafale jets as government clears Rs 3.6 lakh crore mega deal

BJP MP Nishikant Dubey moves motion seeking Rahul Gandhi’s expulsion from Parliament

Amendments in US fact sheet on trade deal reflect shared understanding: MEA

Bharat bandh: Normal life disrupted, banking, transport services affected in some states

T20 World Cup: Samson falls for 22 after India sent in to bat by Namibia

SCROLL FOR NEXT