People wade through the flooded water of the Yamuna River at Yamuna Bazar in New Delhi, India, 19 August 2025.  File photo | Express
Delhi

Delhi flood control dept crosses 57 per cent desilting target

The progress is significant in critical stretches. Work on 21 priority drains has crossed 76% completion, said officials.

Express News Service

NEW DELHI: With monsoon approaching, the Irrigation and Flood Control Department has accelerated its desilting operations across the capital’s major drains, achieving over 57% of its total target so far in a bid to minimise waterlogging and urban flooding.

According to official figures, desilting work across 76 drains has reached 57.68% completion, with more than 16.48 lakh cubic metres of silt already removed against a total target of 28.5L cubic metres.

The progress is significant in critical stretches. Work on 21 priority drains has crossed 76% completion, said officials. The Najafgarh drain system, one of Delhi’s most flood-prone zones, has achieved nearly 48% progress, while the remaining 55 drains have also shown steady momentum, touching over 63% completion.

Officials on the ground said that the approach this year is more structured, with simultaneous work across multiple zones rather than a last-minute rush. Vulnerable points identified from previous years are being prioritised to ensure smoother water flow.

India says Chinese deviation from established patrolling patterns disturbs LAC situation

‘Preventing protests takes priority’: Dipke questions Centre’s focus amid China border concerns

14 Indians safe after dhow incident off Yemen coast; efforts on to evacuate stranded Umrah pilgrims: MEA

Delhi HC rejects Neha Bora’s plea to quash Rs 10,000 peace bond notice over protests

‘If LoP tries to spread anarchy, we will respond on streets and in House’: Nitin Nabin