Imge used for representational purposes only Express
Andhra Pradesh

Karavadi-Surareddipalem third line commissioned in AP

This route has become highly congested with the steady increase in both passenger and freight trains

Express News Service

VIJAYAWADA : The third line between Karavadi - Surareddipalem under Vijayawada Railway division of the South Central Railway, covering a distance of 20.3 km, has been successfully completed and commissioned.

This section is part of the Vijayawada-Gudur tripling and electrification project, one of the ongoing major projects in the State. With the tripling of this stretch of railway line, which falls under Prakasam district, 81 km between Bapatla and Surareddipalem will have third line facility along with electrification.

Situated in the Grand Trunk route, the Vijayawada and Gudur section plays a vital role in connecting the Northern and Eastern parts of the country with the Southern States.

This route has become highly congested with the steady increase in both passenger and freight trains.

To decongest this crucial section, the Vijayawada – Gudur third line project was sanctioned in 2015-16 for a distance of 288 Kms at an approximate cost of Rs 3,246 crore.

With the completion of the 20-km Karavadi-Ongole- Surareddipalem section, located in the middle of Vijayawada - Gudur, 209 km of the total 288 kms stretch stands electrified along with third line.

Iran says US military operation 'impossible' as Trump mulls peace proposal

'I was one of the six victims of Brij Bhushan': Vinesh Phogat flags fear of bias in comeback tournament

Bengal polls: TMC challenges BJP to use its 'full machinery' in Falta for repolling on May 21

Vellappally Natesan hopes LDF win in Kerala, predicts BJP opening account

One-year-old among nine killed in massive blaze at residential building in Delhi's Shahdara

SCROLL FOR NEXT