Deputy chief minister KV Singh Deo with officials at the MoU signing ceremony on Friday  Photo | Express
Odisha

OHPC signs pact with WAPCOS for Indravati PSP

The detailed project report of the PSP has been prepared by WAPCOS.

Express News Service

BHUBANESWAR: Odisha Hydro Power Corporation (OHPC) Ltd on Friday inked a pact with WAPCOS Ltd for project management services of 600 MW Upper Indravati pumped storage project (PSP) at Mukhiguda in Kalahandi district.

The agreement was signed in presence of deputy chief minister KV Singh Deo. The project will be located around 500 metre away from the Upper Indravati reservoir at Mukhiguda. The one-of-its-kind unit will have four stages, each having a capacity of generating 150 MW power.

The PSP will have an underground powerhouse located near the lower reservoir and will operate in pumping as well as generating mode in different times of a day by circulating water between the two reservoirs.

The detailed project report of the PSP has been prepared by WAPCOS. The Centre has set a target to achieve 500 GW of installed capacity from non-fossil sources by 2030.

“As more and more renewable energy power is connected to the grid, there is a growing need of more hydro-pumped storage projects to be added to the grid for generation-demand balancing and power system stability,” said Singh Deo, also the Energy minister.

Former Bengal deputy speaker Ashis Banerjee found dead at TMC party office

‘Vande Mataram’ gives Satheesan secular plank amid charges of BJP ties

Villagers name road after CM Vijay in gratitude for Parandur call

SHANTI Act draft rules set operator liability, financial safeguards for private nuclear push

Tamil Nadu BJP chief's 'ask mother' jibe at CM Vijay triggers political backlash

SCROLL FOR NEXT