Deputy chief minister KV Singh Deo with officials at the MoU signing ceremony on Friday  Photo | Express
Odisha

OHPC signs pact with WAPCOS for Indravati PSP

The detailed project report of the PSP has been prepared by WAPCOS.

Express News Service

BHUBANESWAR: Odisha Hydro Power Corporation (OHPC) Ltd on Friday inked a pact with WAPCOS Ltd for project management services of 600 MW Upper Indravati pumped storage project (PSP) at Mukhiguda in Kalahandi district.

The agreement was signed in presence of deputy chief minister KV Singh Deo. The project will be located around 500 metre away from the Upper Indravati reservoir at Mukhiguda. The one-of-its-kind unit will have four stages, each having a capacity of generating 150 MW power.

The PSP will have an underground powerhouse located near the lower reservoir and will operate in pumping as well as generating mode in different times of a day by circulating water between the two reservoirs.

The detailed project report of the PSP has been prepared by WAPCOS. The Centre has set a target to achieve 500 GW of installed capacity from non-fossil sources by 2030.

“As more and more renewable energy power is connected to the grid, there is a growing need of more hydro-pumped storage projects to be added to the grid for generation-demand balancing and power system stability,” said Singh Deo, also the Energy minister.

Trump upbeat as US, Iran hold 'very good' indirect talks in Qatar

Nepal ready for diplomatic dialogue with India to resolve border dispute, says Foreign Minister Khanal

From India's furnace to Europe's inferno: The science behind extreme heat

Why the US Supreme Court's birthright citizenship ruling is a major relief for Indians

India urges Pakistan to free 188 prisoners; seeks consular access to 13 Indians

SCROLL FOR NEXT