Telangana

SCCL proposal on 800 MW thermal power plant in Pegadapalli deferred

The sub-committee which had visited the site of the proposed power plant asked for more details from SCCL, including an action plan for not using groundwater from the Godavari river.

From our online archive

HYDERABAD: The Expert Appraisal Committee (EAC) of the Union Ministry of Environment and Forests, constituted for Environmental Impact Assessment, has deferred the hearing of proposal on the installation of SCCL’s 800 MW thermal plant in Pegadapalli, for want of more reports.

The sub-committee which had visited the site of the proposed power plant asked for more details from SCCL, including an action plan for not using groundwater from the infiltration galleries of river Godavari.

Maharashtra government scraps 5% Muslim quota in jobs, education; Opposition terms move ‘anti-minority’

Google CEO Sundar Pichai highlights India's AI potential, announces US-India connectivity initiative

Galgotias University asked to vacate AI Summit expo after Chinese robodog row

Those joining BJP became insignificant: Assam Congress chief on Bhupen Borah's plan to switch sides

Ajit Pawar plane crash case: Rohit bolsters sabotage claim, presents supporting documents

SCROLL FOR NEXT