The 11-storey high rise in Moulivakkam before the demolition was executed. | (Jawahar/EPS) 
India

Step-by-step destruction of the Moulivakkam high rise

The 11-storey building at Moulivakkam, the twin of the ill-fated one that came down crashing over two years ago killing 61 workers, was demolished at 6.51 pm on Wednesday after missing three deadlines earlier in the day.

From our online archive
Explosives went off on the fifth floor and the first floor at 6.51 pm resembling a massive Deepavali firework. (Sampath | EPS)
The building collapsed neatly, crumbling vertically down within its own plot of land. (Martin Louis | EPS)
In less than five seconds, the entire building was reduced to dust.  (Martin Louis | EPS)
11-storey building at Moulivakkam was demolished at 6.51 pm. (Martin Louis | EPS)
Here's the same demolition from a different view point. (Jawahar | EPS)
The original deadline set was 4 pm. But it was shifted to 5 pm and then to 5.45 pm. (Jawahar | EPS)
But it could not be carried at 5.45 pm too, but was finally done after about an hour. (Jawahar | EPS)
The building crumbled neatly likely causing no damage to the properties nearby. (Jawahar | EPS)
The buidling crumbled vertically down within its own plot of land. (Jawahar | EPS)

Rubio says Hormuz violations 'won't be tolerated' as EAM Jaishankar raises US killing of Indian seafarers

Five killed after IAF transport aircraft crashes in Assam's Jorhat airbase

Iran says US deal won't be signed Sunday despite Pakistan's 24-hour prediction

TMC civil war: Sudip Bandyopadhyay joins rebel MP Satabdi Roy to meet BJP leaders

'I deserve hate': Comedian Pranit More issues second apology over 'Rs 370 biryani' remark

SCROLL FOR NEXT