DCM DK Shivakumar inspects Sachara Yukta Project work in Bengaluru on Monday. (Photo | Express)
Bengaluru

300 km of buffer road along stormwater drains, lakes in Bengaluru to be built in first phase

Terming the construction of buffer roads as a historic intervention, DK Shivakumar said, "In the first phase, 300 km of buffer roads will be constructed in Rajarajeswari Nagar, ITPL and other areas.”

Express News Service

BENGALURU: Deputy Chief Minister D K Shivakumar said the construction of the 5.5-km buffer road from Koramangala to Sarjapur will be completed by March next year. The DCM inspected the construction work of the ‘Sachara Yukta Project’, including buffer roads along stormwater drains, here on Monday.

Terming the construction of buffer roads as a historic intervention, Shivakumar said, “To ease traffic congestion in Bengaluru, we are constructing roads in the buffer zones of stormwater drains and lakes in the city. In the first phase, 300 km of buffer roads will be constructed in Rajarajeswari Nagar, ITPL and other areas.”

He said that a buffer road will start from MG Road and go up to Bellandur, cutting through the defence land and that this would reduce a 10-km journey as the public need not go around the military area.

Shivakumar said heavy vehicles like buses and lorries would not be allowed on the buffer roads, as there should not be any road collapse due to heavy vehicle movement. “School vans, two-wheelers and cars will be allowed,” he said.

He said Transferable Development Rights (TDR) would be given to landowners, whose land would be acquired for construction.

Why the additional declaration linked to Form 6 is facing a legal challenge

SP-Congress alliance faces fresh strain as Akhilesh skips INDIA bloc meet over UP seat-sharing talks

Rahul Gandhi tells CWC to continue 'resistance' against 'match-fixing' of polls through EVM, voters list

Assam Rifles jawan killed in militant attack in Arunachal; security forces intensify ops to arrest killers

SC slams medicine pricing, calls cancer drug’s 10-fold MRP markup ‘carnage’