Image used for representational purpose only (File Photo) 
Chennai

All we want is road and water, say voters in Nerkundram

The work to re-tar this stretch began just 20 days before the elections were announced.

C Shivakumar

CHENNAI: Nerkundram is bustling with activity now, as workers are levelling the muddy road to lay tar on a stretch that was hardly motorable for the last five months after the Chennai Metro Water dug up the area to lay underground storm and drinking water pipelines.

The arterial road that links Nerkundram and Chinmaya Nagar with Poonamallee Highway, Koyambedu Market, and the Kaliamman Koil Street has been in bad shape for the last five months. The work to re-tar this stretch began just 20 days before the elections were announced.

Work on the underground  sewage network is likely to take time as only half has been  completed. We are planning four sewage treatment plants in the area, said a Chennai Metro Water official.  Water is also an issue in this area. Residents  are still dependent on Metro Water water tanks, borewells, private water tankers and water cans.

Jantar Mantar protest LIVE | CJP says July 20 was just a trailer, millions more will come to Delhi

World 'extremely turbulent', no nation can face challenges alone: Jaishankar urges deeper India-ASEAN cooperation

Trump announces steep tariffs on generic drug imports from 2028; India pharma exports may take a hit

Parliament Monsoon Session Day 3 LIVE | Lok Sabha adjourned till noon; Opposition to observe 'black day'

Nothing can shame those unfazed by Ram temple donation row: Allahabad HC

SCROLL FOR NEXT