Image used for representational purpose only (File Photo) 
Chennai

All we want is road and water, say voters in Nerkundram

The work to re-tar this stretch began just 20 days before the elections were announced.

C Shivakumar

CHENNAI: Nerkundram is bustling with activity now, as workers are levelling the muddy road to lay tar on a stretch that was hardly motorable for the last five months after the Chennai Metro Water dug up the area to lay underground storm and drinking water pipelines.

The arterial road that links Nerkundram and Chinmaya Nagar with Poonamallee Highway, Koyambedu Market, and the Kaliamman Koil Street has been in bad shape for the last five months. The work to re-tar this stretch began just 20 days before the elections were announced.

Work on the underground  sewage network is likely to take time as only half has been  completed. We are planning four sewage treatment plants in the area, said a Chennai Metro Water official.  Water is also an issue in this area. Residents  are still dependent on Metro Water water tanks, borewells, private water tankers and water cans.

Sonia's memoir revisits Shah Bano row, Ayodhya dispute and Rajiv's political dilemmas

Centre overhauls visa regime, cuts categories from 13 to 9 to ease entry for foreigners

Hasina’s return threat puts Bangladesh in a fix as political tensions collide with economic crisis

Two SPOs go missing in J&K's Kishtwar, police and Army launch massive search operation

'Ground has shifted' under Modi govt; regime 'not here to stay': Sonia Gandhi in memoir