Andhra Pradesh

The first phase of Purushothapatnam Lift Irrigation Scheme completed

The first phase of the Purushothapatnam Lift Irrigation Scheme (PLIS) envisaged to take Godavari river water to Yeleru reservoir through the Polavaram left canal, has been completed.

From our online archive

RAJAMAHENDRAVARAM: The first phase of the Purushothapatnam Lift Irrigation Scheme (PLIS) envisaged to take Godavari river water to Yeleru reservoir through the Polavaram left canal, has been completed.

Chief Minister N Chandrababu Naidu will inaugurate the scheme on August 15. At first, two pump sets will be operated for lifting Godavari water for irrigation and drinking purposes.

District Collector Kartikeya Mishra said elaborate arrangements were made for the Chief Minister’s programme. The Chief Minister will unveil a pylon to mark the inauguration of the lift irrigation scheme.

He will also visit  Nagampalli in Seethanagaram mandal where the Godavari water flows into Polavaram left canal. Megha Engineering and Infrastructures  Ltd (MEIL) is making all necessary arrangements for the inauguration of the lift irrigation scheme on a war-footing.

The She vote in Bangladesh and how it has placed the victorious BNP on notice

Trust will define Dhaka’s new era

No-confidence move against Speaker Om Birla revives debate on seven-year vacancy of Dy Speaker’s post

ChatGPT and the Republic of Noddies

From exile to executive: Tarique Rahman’s long march to power

SCROLL FOR NEXT