Karnataka

Water crisis in Linganamakki cuts down power supply to two weeks

With no rains in the Sharavathi catchment area of Linganamakki reservoir, the authorities have minimised the production of hydro power.

Ramachandra V Gunari

SHIVAMOGGA: With no rains in the Sharavathi catchment area of Linganamakki reservoir, the authorities have minimised the production of hydropower. If this continues, they can generate power only for another fortnight. Even after 20 days in June, the district is still facing acute water shortage. H Mohan, chief engineer, told Express, “We have lowered the power generation following inadequate water in the reservoir. With the available water, it is only sufficient to generate power for the next 20-25 days.”

While the maximum water level in the reservoir is 1,819ft, it was 1,744.95ft on Thursday. The total available water is just 9.40% of the total capacity. As per the authorities, about 12.05 million units of power are generated every day.

But for the past one week, the power generated has reduced to a great extent. In June last year, Linganamakki reservoir received an average inflow of 10,000 cusecs due to heavy showers in the catchment areas such as Hosanagara taluk, which is the maximum catchment area for the reservoir.

NEET protests: SC says right to peaceful protest is guaranteed, to hear police excesses pleas Tuesday

Congress MPs protest alleged 'police brutality' against NEET protesters, seek Shah’s apology

Suspense to end as Karnataka CM says cabinet expansion will be finalised this week

RAF personnel fired seven pellet rounds during July 20 student protest: Report

Parliament Monsoon Session Day 6 LIVE | Both houses adjourned till 12 noon; Congress MPs protest demanding apology over pellet gun use

SCROLL FOR NEXT