Chennai

Power shutdown in parts of Chennai on Sept 25

From our online archive

CHENNAI: For carrying out maintenance work, power supply will be suspended by Tangedco on Wednesday (Sept 25) from 9 am to 5 pm in these following areas. According to a statement from Tangedco, power supply will be resumed before 5 pm if work is completed. Here is the list.

MATHUR: Apollo Armstrong nagar, Nathiya nagar, China Mathur, Arulananda nagar, Bharathi 1 to 3 street, Devi Karumari amman koil st, Kullakarai st, MGR salai, MMDA 3 rd main road part.

POONAMALLEE: Abirami nagar, V.G.N.nagar, Kaduvetti, Bye Pass road, Poonamallee, Senneerkuppam, Kumunanachavadi, Gorimedu, Mangadu, Bathrimedu, Ragunathapuram, Kandhasamy Nagar, Thirumal nagar, Marannagar, Karayanchavadi, Ambal city.

THIRUMUDIVAKKAM : Sidco Industrial Estate, Sidco, Kalaingar st, Mangalapuram, Royal Castle appartment, Thirumudivakkam main road, Kundrathur bazzar, Part of Murugan koil , Nadaipathai part, Melandai st, Thirumudivakkam, Pazhanthandalam, Erumaiyur village, Kalaimagal nagar, Karpagam nagar, Rajiv Gandhi nagar, Sriukalathur, Nandhambakkam, Kalathipettai, Periyar nagar, Anjugam nagar, Somangalam, Naduveerapattu, Shakthi nagar, poonthandalam, Puthuperu, D.C Nagar, Melathur, Sidco, Vazhuthalampedu part, Thiruneermalai main road, Palm Rivera Appartments, Navins Appartments, Heritage, Perumal nagar, Sambandham nagar, Siva Vishnu nagar, Natham, Arunachaleshwar nagar, Padmavathy nagar, Devagi nagar, Devi nagar, Ishwara nagar, Vazhuthalampedu, Manikandan nagar, Vazhuthalampedu part, Amarprakash Appartment.

SCROLL FOR NEXT