The 11-storey high rise in Moulivakkam before the demolition was executed. | (Jawahar/EPS) 
Nation

Step-by-step destruction of the Moulivakkam high rise

The 11-storey building at Moulivakkam, the twin of the ill-fated one that came down crashing over two years ago killing 61 workers, was demolished at 6.51 pm on Wednesday after missing three deadlines earlier in the day.

From our online archive
Explosives went off on the fifth floor and the first floor at 6.51 pm resembling a massive Deepavali firework. (Sampath | EPS)
The building collapsed neatly, crumbling vertically down within its own plot of land. (Martin Louis | EPS)
In less than five seconds, the entire building was reduced to dust.  (Martin Louis | EPS)
11-storey building at Moulivakkam was demolished at 6.51 pm. (Martin Louis | EPS)
Here's the same demolition from a different view point. (Jawahar | EPS)
The original deadline set was 4 pm. But it was shifted to 5 pm and then to 5.45 pm. (Jawahar | EPS)
But it could not be carried at 5.45 pm too, but was finally done after about an hour. (Jawahar | EPS)
The building crumbled neatly likely causing no damage to the properties nearby. (Jawahar | EPS)
The buidling crumbled vertically down within its own plot of land. (Jawahar | EPS)

LIVE | West Asia conflict: Trump warns Iran of 'much, much harder' strikes if oil supplies blocked

INTERVIEW | We stand guard over allies, not engaged in US-Israel strikes on Iran: NATO official Berti

70 years young: Shashi Tharoor brand lives on amid controversy as constant companion

Tensions rise in INDIA bloc as Left objects to Rahul Gandhi’s remarks on Kerala CPI(M)-BJP ties

G7 'not there yet' on release of oil reserves amid Mideast War: French finance minister

SCROLL FOR NEXT