Chandrayaan-2: Going where no country has ever gone before
Online Desk
Vikram lander mounted on top of the orbiter of Chandrayaan-2 on top of the orbiter. (Photo | ISRO)Hoisting of Vikram lander during Chandrayaan-2 spacecraft integration at launch centre. (Photo | ISRO)Pragyan Rover mounted on the ramp projecting from out of the sides of Vikram lander. (Photo | ISRO)Integration of C25 cryogenic stage toL110 stage in progress. (Photo | ISRO)C25 Cryogenic stage at vehicle assembly building for vehicle integration. (Photo | ISRO)Transportation of partially integrated GSLV MkIII M1 vehicle on Mobile launch pedestal. (Photo | ISRO)L110 stage integrated with S200. (Photo | ISRO)Hoisting of L110 stage for integration with S200. (Photo | ISRO)Transportation of liquid L110 stage for integration. (Photo | ISRO)Hoisting of a slanted nose cone of S200 after the placement of S200 solid booster on mobile launch pedestal. (Photo | ISRO)Placement of one of the S200 solid boosters of GSLV MkIII M1 vehicle on mobile launch pedestal. (Photo | ISRO)One of the segments of an S200 booster being carried during vehicle integration. (Photo | ISRO)Hoisting of the equipment bay of GSLV MkIII M1 Vehicle during integration. (Photo | ISRO)The mission is scheduled to be launched from there at 2.51 am on July 15. (Photo | ISRO)