National Disaster Response Force carry on rescue operations while onlookers stand at the site where the engine of the New Farakka Express train derailed along with eight coaches near Harchandpur Railway station in Rae Bareli on October 10, 2018. | (File | 
India

New Farakka Express derailment: Preliminary enquiry indicates glitch in train's guiding system

The report of the Commission of Railway Safety (CRS) released Tuesday suggested the reason behind the derailment was that it was given a green signal despite the point failure.

From our online archive

NEW DELHI: A preliminary enquiry into the derailment of the New Farakka Express has indicated that it went off the tracks as a mechanical installation which guides trains from one track to the other had failed to respond, according to a report.

The report of the Commission of Railway Safety (CRS) released Tuesday suggested the reason behind the derailment was that it was given a green signal despite the point failure.

A point is at the juncture of two tracks - only when it creates a path for the train, a signal is given to it to go ahead.

In this case, despite the point failure, the train was given a green signal, the report suggested.

The commissioner of railway safety, who is investigating the accident, has recommended that the railways should decide a reasonable time as well as a reasonable number of attempts after which a point, not responding to the command given from contrail panel, is to be declared as failed.

Five people died and around 30 were injured when five coaches of the New Farakka Express derailed near Rae Bareilly on October 10.

The report not only made the Engineering department take responsibility but also indicated that the signaling and the Telecom department too take the onus of the accident.

It has listed measures that should be taken to avoid tampering of signaling circuit.

It has also asked that drivers be trained to use the independent loco brake in case of an emergency only when it is completely unavoidable.

The final report of the CRS is expected in a couple of months which will pin responsibility on departments and officials, sources said.

Fire breaks out on Rajdhani Express in MP's Ratlam, all passengers rescued

Centre dismisses CBSE On-Screen Marking concerns; cuts revaluation fees for students

One of biggest Ukrainian drone attacks on Russia kills four, wounds several near Moscow

CNG prices raised again in Delhi-NCR by Rs 1 per kg; second hike in two days

'Friendship with Stalin beyond politics': Rajinikanth rejects claims of jealousy towards CM Vijay

SCROLL FOR NEXT