Image used for representational purpose. Photo | Express
Andhra Pradesh

Chief Secretary orders 24x7 quality power supply

At a high-level review meeting held at the CS Conference Hall, he reviewed the power supply performance of APEPDCL and APSPDCL.

Express News Service

VIJAYAWADA: Chief Secretary K Vijayanand on Tuesday instructed Andhra Pradesh power utilities to implement strict measures to ensure uninterrupted and high-quality power supply across the State.

At a high-level review meeting held at the CS Conference Hall, he reviewed the power supply performance of APEPDCL and APSPDCL.

The meeting was attended by Andhra Pradesh Eastern Power Distribution Company Limited (APEPDCL) Chairman and Managing Director (CMD) I Prudvi Tej, Andhra Pradesh Southern Power Distribution Company Limited (APSPDCL )CMD K Santosha Rao, Transmission Corporation of Andhra Pradesh Limited (APTRANSCO) Director (Grid) AKV Bhaskar, along with senior engineers. Vijayanand called for swift replacement of damaged service wires, aged conductors, and prompt resolution of recurring faults.

He directed the formation of mandal-level technical teams to address issues like low voltage, jumper faults, and hanging wires.

Stressing consumer satisfaction, he urged field staff to act immediately on complaints, especially with monsoon conditions increasing electrical risks.

He asked electricity staff at ward and village secretariats to prioritise field duties, except on pension days, and emphasised the importance of continuous power supply for domestic, commercial, and industrial use.

For industries, he advised alternate line connections and public communication on planned outages.

On the solar front, Vijayanand directed DISCOMs to fast-track implementation of the PM-KUSUM scheme by finalizing SOPs and completing pending solarization of agricultural motors.

CMD I. Prudvi Tej noted underground cabling is being expedited post rains. As of July 6, the PM-Surya Ghar scheme registered 99,346 applications for 51,453 kW capacity, targeting over two lakh SC/ST consumers in 30 divisions.

CMD Santosha Rao reported 6.05 lakh applications and 7,461 commissioned projects under PM-Surya Ghar, with 2.07 lakh SC/ST households proposed for 415.67 MWp.

Under PM-KUSUM, 610 MW tenders covering 1.35 lakh pump sets have been finalised.

BCI chair apologises over NALSAR ban order, says students 'don't require anyone to decide for them'

Jharkhand protest: Students to burn Soren and Rahul effigies, gherao CM's residence August 20

Tamil Nadu BJP chief's 'ask mother' jibe at CM Vijay triggers political backlash

SHANTI Act draft rules set operator liability, financial safeguards for private nuclear push

PoK would be protesting to reunite with J&K had Article 370 stayed: Omar Abdullah in I-Day speech

SCROLL FOR NEXT