A view of North Cargo Berth-III of the VO Chidambaranar Port  Photo | Express
Tamil Nadu

North Cargo Berth-III ready for interim operations, say port authorities

The statement further stated that the terminal equipped with 120 tonnes capacity harbour mobile cranes can discharge dry-bulk cargo such as coal, limestone, gypsum, rock phosphate, and copper concentrate.

Express News Service

THOOTHUKUDI: The North Cargo Berth-III of VO Chidambaranar Port Authority, operated by JSW Tuticorin Multipurpose Terminal, is ready for interim commercial operations, said a statement released by the port authorities.

The statement further stated that the terminal equipped with 120 tonnes capacity harbour mobile cranes can discharge dry-bulk cargo such as coal, limestone, gypsum, rock phosphate, and copper concentrate. The 306 metre long terminal having 14.20 metre draft, facilitates berthing of 95,000 dead weight tonnage vessels of maximum LoA of 260 metres and beam of 48 metres.

The dredging in front of the terminal carried out from April 05, 2025, concluded in just 26 days enabling berthing fully loaded panamax vessels with a draft of 14.20 metres. Further, the channel will be widened from 153 metres to 230 metres, facilitating berthing of larger size bulk carriers and container vessels.

Iran military officer says war with US ‘likely’ to restart as Trump 'not satisfied' with Tehran's proposal

Repolling at 15 booths in West Bengal’s South 24 Parganas concludes; 87% turnout recorded till 5 pm

Israeli airstrikes on southern Lebanon kill seven despite ceasefire

Exit polls manipulated by BJP to mislead voters: Gaurav Gogoi

Four labourers killed, several feared trapped in slurry collapse at Jharkhand's Dhanbad

SCROLL FOR NEXT