Telangana

Dana Kishore reviews progress of PPM of roadsz

As many as 550 km of Periodic Preventive Maintenance (PPM) road works have been completed, said GHMC Commissioner, M Dana Kishore.

From our online archive

HYDERABAD: As many as 550 km of Periodic Preventive Maintenance (PPM) road works have been completed, said GHMC Commissioner, M Dana Kishore. Reviewing the progress of road laying, manhole and catch-pit restoration works with engineering officials through teleconference, Dana Kishore said BT roads of 833 kilometres in the city have been scheduled for PPM. Funds to the tune of Rs 78 crore will be released by the corporation shortly, he said. 

He directed Chief Engineer (Maintenance) Md Ziauddin to see that wherever road relaying works are in progress, the department should hold meetings with contractors and see that works are done as per laid-down specifications. “Quality should be checked thoroughly and only then should the bills be released,” he said.

Iran warns US troops, Israel will be targeted if America strikes over protests; death toll hits 538

Shops, houses, mosque allegedly set on fire in Tripura after altercation over collecting funds for local temple

US President Donald Trump tells Cuba to 'make a deal, before it is too late'

India beat New Zealand by four wickets in first ODI

CBFC cuts must guide, not dictate content

SCROLL FOR NEXT