An image of a NTPC power plant for representational purposes. (File Photo |EPS) 
Telangana

PM Modi to dedicate Ramagundam NTPC’s solar grid to nation on Saturday

The country’s largest floating solar power project of 100 MW capacity at NTPC Ramagundam will be dedicated to the nation by Prime Minister Narendra Modi on July 30.

Express News Service

PEDDAPALLI: The country’s largest floating solar power project of 100 MW capacity at NTPC Ramagundam will be dedicated to the nation by Prime Minister Narendra Modi on July 30.As part of the closing ceremony of Ujjwal Bharath - Ujjwal Bhavishya -Power @2047, the PM would dedicate two floating solar power projects in India, one of which is in Ramagundam.

According to NTPC authorities, Ramagundam floating solar power plant was constructed at a cost of Rs 423 crore. Commissioning of the 100 MW floating solar project would save 1.65 lakh tones of coal per annum and reduce the emission of 2.1 lakh tonnes of CO2 per annum.The commercial operation of 100 MW Ramagundam floating solar PV project began on July 1, 2022.

'Witnessing betrayal of Indian farmers': Rahul Gandhi sharpens attack on Centre over US trade deal

Don't turn AI-Mela into a jhamela: How India can go beyond PR at its AI Summit

India vs Pakistan: Heightened security, buzzing fans bring Colombo to a standstill

Indian student found dead in California, six days after going missing

Debate, vote on motion to remove LS Speaker Om Birla to be taken up on March 9: Rijiju

SCROLL FOR NEXT