An image of a NTPC power plant for representational purposes. (File Photo |EPS) 
Telangana

PM Modi to dedicate Ramagundam NTPC’s solar grid to nation on Saturday

The country’s largest floating solar power project of 100 MW capacity at NTPC Ramagundam will be dedicated to the nation by Prime Minister Narendra Modi on July 30.

Express News Service

PEDDAPALLI: The country’s largest floating solar power project of 100 MW capacity at NTPC Ramagundam will be dedicated to the nation by Prime Minister Narendra Modi on July 30.As part of the closing ceremony of Ujjwal Bharath - Ujjwal Bhavishya -Power @2047, the PM would dedicate two floating solar power projects in India, one of which is in Ramagundam.

According to NTPC authorities, Ramagundam floating solar power plant was constructed at a cost of Rs 423 crore. Commissioning of the 100 MW floating solar project would save 1.65 lakh tones of coal per annum and reduce the emission of 2.1 lakh tonnes of CO2 per annum.The commercial operation of 100 MW Ramagundam floating solar PV project began on July 1, 2022.

Several feared dead after fire rips through ski resort town in Switzerland

Zohran Mamdani sworn in as New York City mayor at historic subway station

Cities around the world welcome 2026 with thunderous fireworks and heightened security

Lokpal scraps controversial tender to buy seven BMW cars

Census, SIR & empirical statistical portrait of India

SCROLL FOR NEXT