For representational purposes (Photo | Vishnu Prathap, EPS) 
Bengaluru

Bengaluru suburban rail project gets clearance from extended railway board

The Rs 15, 990 crore project which will run to 148.17 km is looked at as a solution to ease the notorious Bengaluru traffic.

From our online archive

BENGALURU: The much sought after Suburban Rail Project for the city has been cleared by the Extended Board of Railways (EBR) on Monday evening. The Rs 15, 990 crore project which will run to 148.17 km is looked at as a solution to ease the notorious Bengaluru traffic.

According to a highly placed railway official, there was no separate need to get any clearance from Niti Aayog as its representatives were a part of the EBR.

"The project will now have to be cleared by the Union Cabinet. It is likely to get it within a month's time," he said. Minister of State for Railways Suresh C Angadi and Bengaluru Central MP P C Mohan tweeted about it.

The project will cover these four corridors: Krantivira Sangolli Rayanna (Bengaluru City)-Yesvantpur-Yelahanka-Devanahalli-Kempe Gowda International Airport; Baiyappanahalli-Banaswadi-Lottegehalli-Whitefield-Yesvantpur; Kengeri-Cantonment-Whitefield and Hellalige-Baiyappanahalli-Channasandra-Yelahanka-Rajanakunte.

It has a 2025 deadline.

Cong demands PM Modi's resignation for 'match-fixing' polls through CEC; demands suspension of SIR

NCERT book says Indian subcontinent saw invasions since 7th century, driven by territorial, religious motives

Asian Games 2026: Shooter Neeru ends India's wait, bags historic gold in trap discipline

One Assam Rifles jawan killed, four injured in suspected militant attack in Arunachal's Changlang district

Jaishankar flags US lack of understanding on cross-border terror concerns, says it impacts bilateral ties