Industries Minister P Rajeeve visiting Chellanam on Sunday | Express 
Kochi

Chellanam tetrapod seawall project phase 1 to be over in April: Minister Rajeeve

The first phase of tetrapod seawall project at Chellanam will be completed in April, Industries Minister P Rajeeve said on Sunday.

Express News Service

KOCHI: The first phase of tetrapod seawall project at Chellanam will be completed in April, Industries Minister P Rajeeve said on Sunday. He was speaking during his visit to Chellanam to review the progress of the Rs 344.20-crore tetrapod seawall and groyne field project.

Nearly 40% of the work has been completed, said Rajeeve, who is the minister in-charge for the district, who also held discussions with officials of Uralungal Labour Contract Cooperative Society (ULCCS), which is executing the project. Kochi MLA K J Maxi attended the meeting.“The Bazaar part of the coastal region, which is vulnerable to rough sea, has been included in this phase.

Here, six groynes (pulimuttu) – a low wall or barrier built out into the sea from a beach to check erosion and drifting – will be erected. A footpath on the entire stretch is also being built,” he said. The Bazaar area will see the construction of seawall along a 700-m coastal stretch. The area was included in the first phase following protests by Chellanam residents. The Chellanam seawall work was launched in February by Chief Minister Pinarayi Vijayan.

Lok Sabha braces for Opposition heat as paper leak bill comes up today

Inside high-powered task force entrusted with overhauling India's examination system

RAF personnel fired seven pellet rounds during July 20 student protest: Report

Lower contesting age: CM Revanth Reddy to meet Rahul, Kharge in Delhi today

Oil prices ease after US and Iran pause their attacks

SCROLL FOR NEXT