Representational Image| S Udayshankar 
Kochi

Green Corridor in Kochi remains a non-starter

Nearly a year has passed since the announcement of a ‘Green Corridor’ in the city.

Express News Service

KOCHI: Nearly a year has passed since the announcement of a ‘Green Corridor’ in the city. It was also announced, in August 2021, that the detailed project report (DPR) for the corridor -- a 2.5km stretch between Ernakulam Town and Ernakulam Junction railway stations -- will be ready by November. However, nothing has happened since then and the much-hyped proposal to decongest MG Road and Banerjee Road remains a non-starter.

Kochi Mayor M Anilkumar said the Covid pandemic and the slow pace of the smart city work have delayed the project. “There is no DPR. We have only carried out a survey and made estimates,” he said.
The project was to be implemented with a USD 1 million grant under the European Union’s Mobilise Your City (MYC) initiative, with the support of a French development agency.

Subsequently, the Railways, revenue department and the Kochi corporation held a joint inspection. The Mayor refused to divulge further details. According to the proposal, the ‘Green Corridor’ was to be 12m wide with cycle tracks, walkways and utility ducts. Electric-autorickshaws and battery-operated buggies were to ply on it. The proposal was studied by the students of the Government Engineering College, Thrissur, and the TKM Engineering College, Kollam.

Zomato, Swiggy offer increased payout to gig workers amid strike call by unions on New Year's Eve

South Asian envoys attend Zia's funeral; Jaishankar delivers PM Modi's letter to Tarique Rahman

25-year-old woman gangraped inside moving car, thrown out on road in Haryana; two arrested

Kashmiri shawl seller assaulted, forced to chant 'Bharat Mata Ki Jai' in Haryana; JKSA slams 'growing reign of terror'

Dense fog, poor air and cold wave grip large parts of north and east India

SCROLL FOR NEXT