Thiruvananthapuram

Loos can wait, Padmanabha temple busy with office renovation

There are just four old toilets with damaged roofing;  new complex with 24 units yet to be opened; temple administrative office being revamped for second time in six months

From our online archive

THIRUVANANTHAPURAM: Six months after Prime Minister Narendra Modi dedicated the pilgrim amenities as part of the Swadesh Darshan project at Sree Padmanabhaswami temple, hundreds of devotees are badly hit by the lack of toilet facilities.There are just four old toilets with damaged roofing for devotees at present. They are situated in an old building. A part of the building was pulled down for constructing a new toilet complex. The new complex with 24 units, built as part of the I75.88-crore Swadesh Darshan project, is yet to be opened to the public.    

A few other amenities as part of the project such as a cafeteria, handicrafts emporium and resting facilities are either halfway through or non-starters. Temple executive officer V Ratheesan said some finishing works delayed the opening of the new toilet complex. The facility would be thrown open to the public on Saturday, he said. 

Meanwhile, the temple employees’ union has found fault with the management’s prioritisation of works and wastage of money. The temple administrative office is being revamped for the second time in six months. “In January, the office was shifted to the Ulsavamadom building after spending lakhs of rupees for flooring and furniture. Now, teakwood panelling is done on top of the vitrified tiles. The wooden flooring would cost a hefty sum,” said an office-bearer of the union. 

Ratheesan said the teakwood panelling was being done at the VIP lounge situated in the Ulsavamadom building. “It is not a waste of money since a smooth flooring is required for wooden panelling. While the first revamp was done with the temple fund, the Swadesh Darshan fund was utilised for wooden panelling,” he said.

“The executive officer’s claim is a half-truth. Panelling work was first done at the administrative office and now they are extending it to the VIP lounge. This is a wastage of money at a time when the temple is seeking private sponsorship for renovation of the sanctum sanctorum and flag mast,” the union representative said.    On January 10, four days ahead of the project launch by Modi, Express had reported that the inauguration function was organised in haste and most of the works would take months to be completed. 

Jantar Mantar protest LIVE | JP Nadda likely to meet protesters today; CJP says June 20 was just a trailer

Parliament Monsoon Session Day 3 LIVE | Govt ready to discuss NEET paper leak; Both houses adjourned till 2 pm

'Don't waste our time': SC declines urgent hearing on plea alleging police brutality during CJP protest

Trump announces steep tariffs on generic drug imports from 2028; India pharma exports may take a hit

World 'extremely turbulent', no nation can face challenges alone: Jaishankar urges deeper India-ASEAN cooperation

SCROLL FOR NEXT