Commuters use the Kanaka Durga flyover after it was inaugurated by Union minister Nitin Gadkari and CM Jagan Mohan Reddy, in Vijayawada on Friday. (Photo | EPS/Prasant Madugula) 
Vijayawada

No defect in Kanaka Durga Flyover, says R&B superintendent engineer

The department has conducted load capacity tests five times on the flyover with overloaded vehicles and after thorough examination, permission was given for its inauguration.

From our online archive

VIJAYAWADA: Roads & Buildings (Quality Control) superintendent engineer John Moshe has made it clear that there is no defect in the newly-inaugurated Kanaka Durga Flyover and stated that an excess portion of the construction slab has fallen on the police constable injuring his left hand and shoulder.

Speaking to the mediapersons here on Tuesday, Moshe said that after the incident, concrete chunks fell from the downside portion of the flyover and the excess concrete has been removed. The department has conducted load capacity tests five times on the flyover with overloaded vehicles and after thorough examination, permission was given for its inauguration. He further said that works relating to removal of waste concrete under the flyover will be removed after the completion of Dasara festivities.

It may be recalled here that Union Minister of Road Transport and Highways Nitin Gadkari along with Chief Minister YS Jagan Mohan Reddy inaugurated the Durga flyover virtually on October 16. The six-lane flyover was constructed using span and wing technology at an estimated cost of `467 crore.

Contaminated water caused diarrhoea outbreak in Indore, lab confirms

Centre floats draft labour rules: 90-day work for gig workers’ social security benefits  

'Thinking of you': Zohran Mamdani pens note to Umar Khalid as US lawmakers urge India to ensure him fair trial

Stray dogs issue: Delhi Police files FIR after govt accuses AAP of spreading misinformation

'Are they OK?': Desperate families, friends search for missing after deadly fire at Swiss ski resort

SCROLL FOR NEXT