Guntur Municipal Corporation building  (Photo | EPS)
Andhra Pradesh

Guntur plans integrated corridor project with road expansion and lake restoration push

GMC proposes market redevelopment, junction upgrades and drain modernisation under urban growth plan

Express News Service

VIJAYAWADA: The Guntur Municipal Corporation has unveiled plans for the integrated corridor development project, focusing on the expansion of major roads and restoration of city lakes.

Commissioner K Mayur Ashok stated that the initiative will be carried out with the cooperation and suggestions of public representatives to accelerate urban growth. A review meeting was held at the GMC headquarters with Guntur East MLA Mohammad Naseer and Guntur West MLA Galla Madhavi. Representatives from Andhra Pradesh Urban Infrastructure Asset Management Limited presented proposals covering road upgrades and market redevelopment.

One of the key projects is the redevelopment of PVK Naidu Market into a G+4 structure with a double cellar. The ground and first floors will serve as a vegetable market, while the remaining three floors will be developed as a commercial complex. In the first phase, ten junctions and six major entry routes into the city are set for improvement.

The civic body also plans to upgrade major outfall drains, including Ambedkar Vagu and Peela Vagu, alongside the restoration of lakes.

Markets reel as US-Iran talks collapse sparks fears of prolonged conflict

Kerala Education Minister flags ‘suspicious’ absence of college staff at Nithin Raj’s home

Donald Trump tells Pope Leo XIV to ‘stop catering to the radical left,’ escalating feud over Iran war

‘Voters my route to justice’: NDA candidate Porkodi Armstrong

For many a daily wager, rallies a steady income source in Tamil Nadu

SCROLL FOR NEXT