Image used for representational purpose only. 
Telangana

Telangana objects to AP’s add-ons to HNSS project

The AP also took up construction of mini-lift irrigation scheme on TGP fifth branch canal to feed Kotambedu and Mallemala irrigation tanks in Balayapalli mandal.

Express News Service

HYDERABAD: Irrigation engineer-in-chief C Muralidhar in a letter to Krishna River Management Board (KRMB) chairman raised objections over the additional components being taken up by the Andhra Pradesh government for HNSS project.

“The AP government issued tender notices for HNSS phase-2 - widening of Punganur branch canal; for stabilisation of ayacut and provision of drinking water to the people in Thamballapalle, Madanapalle, Punganur and Palameneru areas. The AP also took up construction of mini-lift irrigation scheme on TGP fifth branch canal to feed Kotambedu and Mallemala irrigation tanks in Balayapalli mandal. The third component is pumping of 5 tmc ft water from TGP-SFC canal to feed Chintalatmakuru tank of Kaluvoya mandal,” the ENC said.

TVK led govt's oath taking ceremony likely on May 7 even as uncertainity looms

ECI, BJP played 'nasty games': Mamata says TMC was not defeated in Bengal, refuses to resign from CM post

Hegseth and Caine say ceasefire between the US and Iran is not over

After Assam debacle, Congress says will play role of 'proactive opposition'

SIR impact on TMC-won assembly constituencies, including Bhabanipur, in the 2026 Bengal Polls

SCROLL FOR NEXT