Karnataka CM HD Kumaraswamy (File | EPS) 
Bengaluru

Elevated Bengaluru corridor only if people require it: Karnataka Chief Minister

Following a meeting regarding the issue on Monday, H D Kumaraswamy said that only preliminary discussions have been held and no decision has been taken yet regarding the same.

Avinash Bhat

BENGALURU: The elevated corridor project in Bengaluru, estimated to cost Rs 15,825 crores, will be implemented only if people supported the project, said Chief Minister H D Kumaraswamy.

Following a meeting regarding the issue on Monday, he said that only preliminary discussions have been held and no decision has been taken yet regarding the same.

"We will go ahead with the elevated corridor project only if people require it. Or else, State government will drop it. If people want to enjoy the situation of (dense) traffic, they can enjoy," he said.

The project has been in the discussion stage for the past 12 years, since 2006 and is being proposed again to ease the traffic congestion in Bengaluru, he said.

Under the proposed project, a total of six interconnected elevated corridors will be built connecting different parts of the city.

To a question regarding opposition to the proposed project, he said that the State government was considering every alternative for the project. Increase metro and BMTC networks, elevated roads and others, which will be ease traffic congestion are being considered, he said.

"We are taking advise from several experts on how to address the situation. Concrete steps will be taken to address the traffic problem," he added.

Hindu man stabbed, set on fire in Bangladesh, escapes by jumping into pond; fourth attack in two weeks

Did candle held close to wooden ceiling spark blaze? Swiss ski resort town reels as 40 feared dead, 115 injured

RBI says economy resilient, banks stronger but warns of rising risks from unsecured loans, stablecoins

Four arrested at Indo-Nepal border in Bihar for illegal entry, fake currency recovered

Drop in terror attacks in Pakistan since Afghan border closure, 2025 most violent in decade

SCROLL FOR NEXT