Power shutdown in Chennai owing to maintenance 
Chennai

Power shutdown in parts of Chennai on Saturday

As a part of routine maintenance works, the electricity board will be suspending power supply in the following areas between 9 am to 4 pm.

From our online archive

CHENNAI: For carrying out maintenance work, power supply will be suspended by Tangedco on Saturday from 9 am to 4 pm in the following areas.

According to a statement from Tangedco, power supply will be resumed before 4 pm if work is completed.

Here is the list:

THIRUMUDIVAKKAM: Sidco Industrial Estate, Sidco, Kalaingar st, Mangalapuram, Royal Castle appartment, Thirumudivakkam main road, Kundrathur bazzar, Part of Murugan koil , Nadaipathai part, Melandai st, Thirumudivakkam, Pazhanthandalam, Erumaiyur village, Kalaimagal nagar, Karpagam nagar, Rajiv Gandhi nagar, Sriukalathur, Nandhambakkam, Kalathipettai, Periyar nagar, Anjugam nagar, Somangalam, Naduveerapattu, Shakthi nagar, poonthandalam, Puthuperu, D.C Nagar, Melathur nagar, Sidco, Vazhuthalampedu part, Thiruneer malai main road, Palm Rivera Appartments, Navins Appartments, Heritage, Perumal nagar, Sambandham nagar, Siva Vishnu nagar, Natham, Arunachaleshwar nagar, Padmavathy nagar, Devagi nagar, Devi nagar, Ishwara nagar, Vazhuthalampedu, Manikandan nagar, Amarprakash Appartment.

Rubio seeks bigger market for US energy and defence systems, pitches Venezuelan oil to India

CJP leaders move Delhi High Court challenging rejection of sureties and extension of custody

PM Modi urges unity against ‘enemies of the country’ at Delhi Dussehra event

Uddhav Thackeray challenges CM Fadnavis to bring Lawrence Bishnoi to Mumbai over Tiger Shroff firing

Tiger Shroff wasn’t original target, shooters wanted to target another Bollywood star: Crime Branch