Power shutdown in Chennai owing to maintenance 
Chennai

Power shutdown in parts of Chennai on Tuesday

Power supply will be resumed before 4 pm if work is completed. 

From our online archive

CHENNAI: Due to maintenance work, power supply will be suspended by Tangedco on Tuesday from 9 am to 4 pm in the following areas. 

Power supply will be resumed before 4 pm if work is completed. 


Here is the list:

SAIDAPET: Thod Hunter nagar, Jones road, Part of Anna salai, Abdul Razzak st, Bazar road, Vinayagam pet, Alandur road, Sastri nagar CIT nagar-I main road, East road, West road, North road , South road, 70 feet road, Old Mambalam road, Kodambakkam road, Karaneswarar kovil st, Sechacalam st, Potter st, Thidder nagar, Kodaedu, Salavayar colony, Arasu Pannai, Jothiamma nagar, Samiyar Thottam, Abith colony, Neruppu medu, VS Mudali st, Jeenis road, Flower st, Jayaram st, Part of Chinnamalai area, Bramin st, Soundareswarar koil st, Bujangararo st, Bala Singh st, Subramaniya koil st, KP koil st and V V Koil st.

MELUR: Minjur town, TH road-Minjur Town, Theradi st, Seemapuram, R-R Palayam/Ariyanvoyal, Pudhpedu, Nadhiyambakkam, Melur, Pattamandhiri, Vallur, Athipattu, S R Palayam, G R Palayam, Kondakarai, Pallipuram, Thiruvelavoyal, Vaayalur, Neithavoyal, Kattor, Merattur, Nallur, Vanippakkam, Oorambedu, Vazhuthigaimedu extension.
 

Satyendar Jain, five others arrested in alleged Delhi Jal Board tender corruption case; AAP alleges BJP vendetta

India says ties with Bangladesh must be based on ‘mutuality of interests’, reciprocity

Vande Mataram: From a poem to India's National Song

Tamil Nadu restores 365-day maternity leave for women govt employees having third child

MEA says credibility of India’s election machinery ‘well-established’ globally after Trump remarks

SCROLL FOR NEXT