Power shutdown in Chennai owing to maintenance 
Chennai

Power shutdown in parts of Chennai on Tuesday

Power supply will be resumed before 4 pm if work is completed. 

From our online archive

CHENNAI: Due to maintenance work, power supply will be suspended by Tangedco on Tuesday from 9 am to 4 pm in the following areas. 

Power supply will be resumed before 4 pm if work is completed. 


Here is the list:

SAIDAPET: Thod Hunter nagar, Jones road, Part of Anna salai, Abdul Razzak st, Bazar road, Vinayagam pet, Alandur road, Sastri nagar CIT nagar-I main road, East road, West road, North road , South road, 70 feet road, Old Mambalam road, Kodambakkam road, Karaneswarar kovil st, Sechacalam st, Potter st, Thidder nagar, Kodaedu, Salavayar colony, Arasu Pannai, Jothiamma nagar, Samiyar Thottam, Abith colony, Neruppu medu, VS Mudali st, Jeenis road, Flower st, Jayaram st, Part of Chinnamalai area, Bramin st, Soundareswarar koil st, Bujangararo st, Bala Singh st, Subramaniya koil st, KP koil st and V V Koil st.

MELUR: Minjur town, TH road-Minjur Town, Theradi st, Seemapuram, R-R Palayam/Ariyanvoyal, Pudhpedu, Nadhiyambakkam, Melur, Pattamandhiri, Vallur, Athipattu, S R Palayam, G R Palayam, Kondakarai, Pallipuram, Thiruvelavoyal, Vaayalur, Neithavoyal, Kattor, Merattur, Nallur, Vanippakkam, Oorambedu, Vazhuthigaimedu extension.
 

Indian national sentenced to 19 years in US prison over foiled assassination plot against seperatist Pannun

MEA says Indus Waters Treaty stance unchanged as Pakistan minister attends SCO forum in Delhi

Congress says Rajasthan panchayat results expose BJP's 'misrule'; BJP vows to review losses

Shinde’s Sena joins hands with Congress, Ajit Pawar’s NCP to keep BJP out of power in Cooperative Bank elections

Trade diplomacy can't replace industrial might