For representational purposes 
Hyderabad

HMDA to insist on more riders for draft layout approvals of real estate projects

HMDA would insist on better infrastructure facilities in the layouts (layouts with open plots and layouts with houses) which are coming up in HMDA limits.

S Bachan Jeet Singh

HYDERABAD: Obtaining draft layouts approved by the Hyderabad Metropolitan Development Authority (HMDA) is going to be tough now for real estate developers and others as it has decided to insist on additional conditions for layout approvals. HMDA would insist on better infrastructure facilities in the layouts (layouts with open plots and layouts with houses) which are coming up in HMDA limits.
HMDA officials told Express that builders seeking draft layout approvals have to make necessary arrangements for providing potable drinking  water supply by duly laying pipelines of the size prescribed to the main trunk, connecting pipeline under Mission Bhagiratha or any other as approved by the relevant authorities such as Hyderabad Metropolitan Water Supply and Sewerage Board (HMWS&SB), ENC

Public Health department or Rural Water Supply (RWS) department.

For all layouts less than 10 acres in size, the developer should put in place a mechanism for sewage treatment in accordance with Telangana State  Faecal Sludge and Septage Management (FSSM). Further, the treated sewage should be connected to the existing public sewerage system up to the point as specified by the authority. In case of layout sites which are more than 10 acres, provision has to be made for the construction of Sewerage Treatment Plant (STP) by earmarking separate area in addition to mandatory layout open spaces. 

The developer should also undertake underground ducting of all utilities and services lines either under footpaths or under central median of the roads as the case may be with proper provisions at junctions and crossings, etc.  

They should also make necessary arrangements for banning use of plastic and plant saplings before the OC is issued. 

Solid waste management
Sites should have space for disposal and dumping of solid waste within the layout site in addition to mandatory open space and bio-compost unit should be developed in accordance with TS Solid Waste Management Rules

Other requirements
The developers are also required to develop cycling tracks, footpaths paved with tiles and any other such material and LED lighting for street lights

TNIE Exclusive | 'Proportional delimitation’ a demographic coup: Kerala CM Pinarayi Vijayan

'WE GOT HIM!': Trump says missing US airman rescued as Iran claims it downed search aircraft

Congress slams Modi over Lok Sabha seats expansion plan, calls it 'Weapon of Mass Distraction'

No CM face in Bengal polls, BJP to seek votes in Modi’s name: State chief Samik Bhattacharya

Amid AAP row over claims he failed to raise Punjab issues in Parliament, Chadha hits back, defends record

SCROLL FOR NEXT