Kochi Metro construction. (File Photo)
Kochi

Clarity sought on proposed Kochi Metro Phase 3 alignment

The group proposed constructing the second phase of the proposed Angamaly-Kochi Airport bypass, connecting Angamaly railway station to CIAL, along with the metro.

Express News Service

KOCHI: Flagging concerns over the proposed Kochi Metro Phase 3 alignment, city-based group Kochi First met Ernakulam Collector and KMRL MD G Priyanka on Tuesday, seeking clarity on road connectivity and the project’s cost.

The group asked whether a proposed four or six-lane greenfield road would be built beneath the metro at Nayathode and whether the MC Road stretch along the alignment would be widened to four or six lanes. They also questioned how an alignment involving such practical difficulties could be considered the most cost-effective option.

They said the proposed alignment does not connect Angamaly railway station or the private bus stand. As an alternative, the group proposed constructing the second phase of the proposed Angamaly-Kochi Airport bypass, connecting Angamaly railway station to CIAL, along with the metro.

Iran war has cost US over $38 billion, with Pentagon spending set to rise by up to $3 billion monthly

UPI MDR: What changes for merchants, consumers and payments above Rs 2,000 from October 15

TDP, Shiv Sena back UCC as JD(U) takes cautious stand after Shah’s 2029 deadline

Two Kuki-Zo women killed in militant attack in Manipur

Oracle India layoffs may affect up to 2,500 employees