Rescue and relief operations underway after a portion of a tunnel under construction between Silkyara and Dandalgaon collapsed. (Photo | PTI) 
Nation

Uttarkashi tunnel collapse: 21 metres drilled through rubble for labourers' rescue

The labourers have been trapped since Sunday morning when a part of the tunnel collapsed following a landslide.

PTI

UTTARKASHI: Working overnight with a powerful machine, rescue workers had by Friday morning drilled up to 21 metres through the rubble in Silkyara tunnel, inching closer to the 40 labourers trapped there for five days.

The workers need to drill up to 60 metres to insert 800 mm and 900 mm diameter pipes -- one after the other -- with the help of a giant drill machine till an escape passage is created for the labourers stuck behind the collapsed portion of the under-construction tunnel, NHIDCL Director Anshu Manish Khalkho said.

The labourers have been trapped since Sunday morning when a part of the tunnel collapsed following a landslide.

"Drilling has been done up to 21 metres so far," the state emergency operation centre's control room in Silkyara said.

The stretch where debris is accumulated begins 270 metres from the mouth of the tunnel at Silkyara side.

Uttarkashi District Magistrate Abhishek Ruhela said that the trapped workers are safe and being supplied with oxygen, medicines, and food and water through pipes.

Constant communication is being maintained with them to keep up their morale, he said.

'Whole region going to burn as you follow Netanyahu's commands': Iran slams Trump's threat

Himanta alleges Pakistan-linked social media group behind Congress press conference material

US, Iran explore 45-day ceasefire proposal: Report

Rahul Gandhi questions Govt on data sovereignty, seeks clarity on US trade talks

TMC, BJP trade hate speech charges ahead of Bengal polls; approach EC

SCROLL FOR NEXT