Surya questioned the need for a tunnel that would allow vehicles to bypass the junction only to return to the same road 2km ahead.  File Photo.
Karnataka

MP Surya calls Hebbal short tunnel project ‘unscientific’

The MP alleged that the project would require the felling of 1,128 trees, increase the risk of flooding near Hebbal Lake and affect groundwater.

Express News Service

BENGALURU: BENGALURU South MP Tejasvi Surya has criticised the proposed 2-km Hebbal Short Tunnel project, calling it “unscientific” and a “waste of Rs 1,350 crore”, and urged the Bangalore Development Authority to abandon it.

The MP alleged that the project would require the felling of 1,128 trees, increase the risk of flooding near Hebbal Lake and affect groundwater. Surya questioned the need for a tunnel that would allow vehicles to bypass the junction only to return to the same road 2km ahead.

Surya argued that Hebbal would benefit more from public transport, pointing to the under-construction Blue Line Metro, the planned Red and Orange lines, and suburban rail connectivity. He alleged that the proposed Veterinary College station on the Red Line, which he said could serve more than 18,000 passengers daily, had been dropped to accommodate the tunnel and elevated road projects.

CJI turns down meeting with LoPs Rahul Gandhi, Kharge over ‘vote chori’, says matter before SC

CJP gives Delhi Police 24 hours to allot date for Jantar Mantar protest

MP John Brittas allegedly pinned down, pushed off bus by Delhi police; writes to Prez, CJI seeking independent probe

One Indian killed, at least 10 injured in Riyadh airport attack; MEA condemns strikes

Saudi Arabia’s King Fahd airport targeted hours after attack on Riyadh airport