Minister for Public Works Department E V Velu inspecting the construction of Jallikattu stadium at Keelakarai village near Alanganallur | Express 
Tamil Nadu

35 per cent work of Alanganallur jallikattu stadium over

Following an inspection, the minister said the jallikkattu arena will be built on an area of 77,683 sq. ft at an estimated cost of Rs 44.6 crore.

Express News Service

MADURAI:  About 35% of the construction work of the jallikattu sports stadium at Keelakarai in Alanganallur has been completed and the remaining works will be completed before December, said Minister for Public Works, Highways and Minor Ports EV Velu. 

Following an inspection, the minister said the jallikkattu arena will be built on an area of 77,683 sq. ft at an estimated cost of Rs 44.6 crore. “The new stadium will consist of a grand lobby, a water tank with a capacity of 50,000 litres, and a leisure hall that can accommodate bulls, tamers, and bull owners. Apart from these, artificial fountains will be set up and a separate place will be given to the medical team for tending to the injured tamers and bulls,” he added.

The construction of jallikattu arena and road laying works will be done in parallel. “The road laying works will be carried out at the cost of Rs 22 crore. Chief Minister MK Stalin will inaugurate the new jallikattu arena in a grand manner,” he added.

'It is our responsibility to ensure the safety of seafarers': Modi at G7, days after Indian mariners killed in US strike

Twisha Sharma death case: Former judge Giribala Singh, son to remain in judicial custody till June 30

Operation Tiger nears completion as six Shiv Sena (UBT) MPs set to join Shinde camp

Air India introduces ‘basic’ fare category, unbundles complementary meal on select routes

Google removes messaging app Telegram from Play Store, Apple likely to follow suit

SCROLL FOR NEXT