B Rajkumar Photo | Express
Tamil Nadu

Return of TNHB land: Scheme to end long-pending disputes announced

TNHB to get new scheme for awarded lands yet to be handed over, and unutilised plots due to encroachments or legal disputes.

Express News Service

CHENNAI: The state government has made an announcement to replace a comprehensive scheme to resolve long-pending disputes involving TNHB (Tamil Nadu Housing Board) acquired lands, while significantly expanding the powers of local bodies and introducing faster, largely digital building approval mechanisms. The previous DMK government had implemented a similar scheme to release 4,396.44 acres of land involved in decades-old TNHB acquisition proceedings.

Housing and Urban Development Minister B Rajkumar, in the Assembly on Friday, said, “The new scheme will cover land parcels where compensation awards have been passed but possession has not been handed over to the TNHB, besides lands that remain unutilised due to encroachments or are caught up in legal disputes. The government will review such land parcels and decide whether to retain them, utilise them for future requirements, or release them, based on necessity.”

The government has also proposed an end-to-end online system for land-use reclassification, under which applicants will be able to track their files at every stage instead of physically following up with respective offices.

In a major move to ease building approvals, the self-certification limit for residential buildings has been increased from 3,500 sq ft to 5,000 sq ft for structures of up to Ground+2 floors or Stilt+3 floors. Self-certification will also be available for small commercial buildings with a floor space index (FSI) area of up to 1,500 sq ft.

A third-party certification mechanism is being introduced for larger buildings, letting authorised professionals to verify compliance and facilitate approvals without applicants having to visit local body offices.

The third-party certification system will cover residential buildings with an FSI area of up to 8,070 sq ft (750 sq m), commercial buildings up to 3,230 sq ft (300 sq m) and industrial buildings up to 26,900 sq ft (2,500 sq m) in approved SIDCO, SIPCOT, and ELCOT estates.

“The government will also simplify the conversion of agricultural wetlands in non-planned areas by replacing the existing district collector NOC process with a time-bound clearance involving the town and country planning, agriculture, water resources, and revenue departments,” he added.

Key announcements

  •  A digital portal for Transferable Development Rights at Rs 1 crore

  •  A smartphone application for autorickshaw and taxi operations

  •  Grid of Roads plan in Chennai metropolitan area at Rs 12 crore

  •  Road infrastructure upgrades at Sathangadu and Koyambedu markets at Rs 20 crore

  •  Expansion of the Koyambedu Wholesale Market with additional shops at Rs 7.5 crore

  •  Reconstruction of 12,648 dilapidated multi-storey tenements at Rs 2,882 crore

  •  Construction of 462 housing units for homeless families in Perambur at Rs 111 crore

Trump announces ‘biggest oil deal in world history’ with Venezuela; US to control 65 billion barrels

Nepal floods LIVE | At least 586 people have died, 2,478 remain missing

Nepal flood toll climbs to 579 amid fear of fresh deluge; India ready to send NDRF teams if required

Nepal flash floods: Anxious wait for kin on status of 49 pilgrims from TN

35 Kannadigas among 70-member group stranded in Tibet allege lack of govt assistance

SCROLL FOR NEXT