Nagarjuna Sagar project (File Photo |EPS) 
Telangana

NSP’s Palair reservoir springs a leak

It may be recalled that the Palair reservoir was constructed in 1929 as a balancing reservoir for the Lal Bahadur Canal, a left bank canal of the Nagarjuna Sagar project.

From our online archive

KHAMMAM: The Nagarjuna Sagar Project (NSP) officials, on Monday, confirmed that the Palair balancing reservoir has developed a leak. According to sources, the officials have been monitoring the situation for the past three days.

It may be recalled that the Palair reservoir was constructed in 1929 as a balancing reservoir for the Lal Bahadur Canal, a left bank canal of the Nagarjuna Sagar project. A major portion of the district depends on this reservoir for their water needs.

Now, the officials have increased the water level in the reservoir to 22 feet to observe the leakage. NSP Superintendent Engineer Sumati visited the spot on Monday to find the origin of the leakage.

CJP issues 7-day ultimatum; threatens nationwide protests if Education Minister Pradhan does not resign

NTA denies claims of leak or sale of NEET UG re-exam paper, warns of strict action against rumour mongers

Surya makes way for Shreyas as Vaibhav gets India call-up

Karnataka Cabinet row: Ramalinga Reddy has withdrawn his resignation, claims Surjewala

'TVK in power due to our grace': Stalin asks DMK workers to pledge end of Vijay-led govt

SCROLL FOR NEXT