For representational purposes 
Telangana

Unavailability of water hits power production in Telangana

After the State Cabinet decided to generate more hydel power, Telangana has been operating hydel projects for the last 11 days.

Express News Service

HYDERABAD: Hydel power generation has gone down at Srisailam and Nagarjuna Sagar projects due to the unavailability of water. The TS Genco generated 3.31 million units (MU) at Srisailam Left, 12.81 MU at Nagarjuna Sagar and 2.01 MU at Pulichintala, on Friday. Besides, 0.08 MU power was generated at Nizamsagar.

The total hydel generation, on Friday, was 18.20 MU. After the State Cabinet decided to generate more hydel power, Telangana has been operating hydel projects for the last 11 days. But, on Saturday, the power generation at Nagarjuna Sagar was stopped due to the unavailability of water. The current water level at Srisailam is 810.80 feet and the water level at Nagarjuna Sagar is 529.20 feet.

18.20 MU ON FRIDAY

 The TS Genco generated 3.31 million units at Srisailam Left, 12.81 MU at Nagarjuna Sagar and 2.01 MU at Pulichintala, on Friday. Besides, 0.08 MU power was generated at Nizamsagar. The total hydel generation, on Friday, was 18.20 MU

INTERVIEW | Whatever somersaults Modi does, BJP cannot enter TN: MDMK leader Vaiko

India attends UK-hosted summit on efforts to reopen Strait of Hormuz

Trump speech on Iran war: When endgame talks meet mid-game reality

CAG report flags Airtel delays in rural connectivity project, highlights BSNL mismanagement

Mamata condemns attack on judicial officers amid SC rap, says BJP 'plotting' unrest for President’s rule

SCROLL FOR NEXT